Workshop- 30 min (Workshop 13:26)
Vertical Stabilizer - 1 hr 30 mins (V.S. 14:01)
Rudder - 1 hrs 30 mins (Rudder 15:04)
Horizontal Stabilizer - 30 mins (H.S. 2:26, Empennage 34:12, Total 47:38)
I built a long dunk tank for the HS spar out of 12 ft. 2x4 and spare pieces and ply from the crate from Van's. Glad that is done!
Massive night of work with alumiprep and alodine. All the pieces that were sitting around are complete. Part of me is glad I did everything at once to save on the set-up and clean up (about 45 min total), but wow is it tiring...
Either way, the parts came out really nice.... Priming tomorrow! -M
Vertical Stabilizer - 1 hr 30 mins (V.S. 14:01)
Rudder - 1 hrs 30 mins (Rudder 15:04)
Horizontal Stabilizer - 30 mins (H.S. 2:26, Empennage 34:12, Total 47:38)
I built a long dunk tank for the HS spar out of 12 ft. 2x4 and spare pieces and ply from the crate from Van's. Glad that is done!
Massive night of work with alumiprep and alodine. All the pieces that were sitting around are complete. Part of me is glad I did everything at once to save on the set-up and clean up (about 45 min total), but wow is it tiring...
Either way, the parts came out really nice.... Priming tomorrow! -M